A working prototype used to end an argument. Somebody had spent three weeks on it, the team could click through it, and the question of whether the thing could exist was settled. Now a prototype often starts an argument nobody meant to have. It was built in an afternoon, it was shown to a customer on Thursday, and on Friday someone asks when it ships.
If you lead product or engineering, you have probably felt this in the last year. AI prototyping has made the cost of a convincing, clickable, data-backed version of an idea collapse to something one person can absorb before lunch. Product management has not caught up with what that does to the rest of the process.
My position: when building is cheap, the scarce skill is deciding, and the PRD did not die. It moved. It used to describe the product after the decision was made. It now has to record the decision before the prototype exists, because the prototype has become the most persuasive and least accountable artefact a team produces.
The case for killing the spec
The argument against the product requirements document is a good one, and I want to state it at full strength.
Long PRDs were mostly unread. They described interactions in prose that a prototype shows in seconds. They went stale the week they were approved. A prototype, by contrast, surfaces the edge case nobody wrote down, gets an honest reaction from a user who would never read twelve pages, and gives the engineer something concrete to argue with. If the prototype is cheap, the reasoning goes, build three and let the users choose.
Serious people are reorganising around this. LinkedIn, according to its chief product officer Tomer Cohen in a December 2025 interview, replaced its Associate Product Manager programme with an Associate Product Builder programme that teaches coding, design and product skills together, and created a "Full Stack Builder" career ladder so that anyone can take a product from idea to launch. Andrew Ng put the consequence plainly in a July 2025 letter: "deciding what to build is the new bottleneck", and product managers with high user empathy "can make decisions by gut and get them right a lot of the time."
I agree with the direction of both. The disagreement is about what replaces the document.
What a prototype cannot tell you
A prototype answers two questions very well: can this be built, and does it feel right to the person in front of it.
It is silent on the questions that decide whether it should exist. For whom, specifically. What it displaces, because every new thing takes attention from an old one. What it will cost to run and support once it has users. What would make you stop. And who has to say yes.
In institutional software those silences are most of the decision. Take an illustrative case from school software. A teacher marking forty scripts on a Sunday night will love a prototype that drafts feedback for her. She is not the person who decides. The principal's timetable decides whether anyone has time to learn it, the board's data rules decide where the scripts may go, and the procurement calendar decides whether it can be bought this year. A prototype tested on the teacher tells you the idea is desirable. It tells you nothing about whether it is adoptable.
The second problem is that prototypes persuade. A thing that works on screen creates commitment out of all proportion to the evidence behind it. It gets shown to a customer, the customer asks when, and an afternoon's experiment becomes a roadmap item that nobody decided on. I call this demo debt: prototypes that were never chosen, but now have users, expectations and a support burden. Across the product portfolio I run, the expensive mistakes were rarely the things we could not build. They were the things we could build, did build, and then had to keep.
Why gut does not scale past the first team
Ng's point about gut is right where he aims it: an early-stage team, one product person close to users, decisions that are cheap to reverse. It breaks in three places.
First, when many people can build. A builder career ladder is, among other things, a way of multiplying the number of people whose gut produces a working artefact. That is a strength until two of them build the same thing differently, or five of them build things that each need a home.
Second, when the buyer is not the user. Gut trained on users is gut about desirability. In B2B and public-sector work, the decision also runs through budget owners, compliance, integration and timing, and nobody has user empathy for a procurement committee.
Third, when the decision has to be revisited by someone who was not in the room. Gut is a decision, but it is not a record. Six months later nobody remembers which bet it was, what it was supposed to prove, or why it is still running. The decisions I most often end up reversing were made by a demo, not by a person.
Where the PRD moved
So keep the document and change its job. Replace the long specification with a one-page decision record, written before the prototype is shown to anyone outside the team. Attach the prototype to it as evidence. Six lines:
- The person and the moment. Not a persona. One role in one situation: "a class teacher marking forty scripts on a Sunday night."
- The claim being tested. One sentence that could turn out to be false: "she will accept drafted feedback on at least half the scripts without rewriting it."
- The stop rule and its date. What you would have to see, by when, to stop.
- What it displaces. Which existing work gets less attention if this goes ahead, and who will notice.
- The running bound. A rough ceiling on what it may cost to run and support per user, set before anyone has fallen in love with it. The estimate itself is a separate discipline; the point here is that a number exists before the demo does.
- The owner. One name, who can say no, and who must if line three fires.
Then build the prototype, as quickly as the tools allow. It is now evidence for line two, not a substitute for lines one to six.
This record is shorter than the old PRD and much harder to write, which is the point. Anyone can describe a screen. Writing a claim that could be false, a stop rule you would honour, and the thing you are taking attention away from is where product judgement actually shows. It also makes "no" a legitimate outcome. A decision record that ends in "we stopped on the date we said we would" is a success, and it should be filed as one rather than buried.
If you sell to institutions, you will recognise the shape. It is the same discipline as a good pilot charter, which writes down success criteria, a decision date and a budget owner before anything is signed. I made that argument for the buyer's side of a school software pilot. The decision record is the same idea pointed inward, at your own team.
The second bottleneck nobody budgets for
Cheap building moves cost to two places, not one. The first is deciding. The second is checking what was built. Stack Overflow's 2025 developer survey found that 84 per cent of respondents use or plan to use AI tools in development, and that more of them actively distrust the accuracy of those tools (46 per cent) than trust it (33 per cent). A team that can produce five prototypes a week has to judge five prototypes a week, and every one that survives has to be reviewed, secured and maintained by people who did not write most of it.
The decision record helps here too. Line four forces the question of what the team will stop looking after to make room, and line six names who is accountable when it needs looking after.
What I got wrong
For a while I treated faster prototyping as an unqualified win, and I counted how many ideas reached a working demo as a sign of a healthy team. The count went up. The number of things worth keeping did not. I was measuring the part that had become cheap and ignoring the part that had not. The fix was not to slow the building down. It was to move the review: from "is the spec complete?" before building to "did we hit the stop rule?" on a date written down in advance.
The decision for Monday
Four changes, in the order I would make them:
- Count your demo debt. List every prototype that has been shown outside the team and has no owner and no stop date. Each one is a decision someone has not made.
- Write the six lines before the next demo leaves the room. Not after the customer has seen it; by then the commitment exists.
- Record "no" as an outcome. File stopped bets with the same care as shipped ones, so the team learns that stopping on schedule is the job, not a failure.
- Move the product review to the stop date. The meeting that matters is no longer the one where the spec is approved. It is the one where the claim in line two is checked against what happened.
Where this is weakest
For a consumer product with instant feedback, large traffic and cheap reversal, an A/B test may decide faster than any record, and the six lines are overhead. Ship both versions and let the data choose.
The argument also rests on running and reversal costs staying high while building cost falls. If they fall as far, and keeping a product alive becomes as cheap as making one, then "build everything and measure" beats deciding up front, and this article becomes a description of a transitional habit.
What would change my mind: evidence from teams that ship prototype-first without any written decision, showing over a year that they stop as many bad bets, as quickly, and carry no more unowned product than teams that write the decision down. I have not seen that evidence. I would like to.
The short version
AI made the prototype cheap and the decision expensive. Prototypes are excellent evidence and poor decisions, because they answer whether something can be built and feels right, and stay silent on whether it should exist. Keep a document, but give it a new job: six lines, written before the demo, naming the person, the claim, the stop rule, what it displaces, the running bound and the owner. Then build as fast as the tools allow.
None of this slows a good team down. It stops a fast team from mistaking momentum for a decision.
Illustrations generated with AI.

